Commit Graph

2 Commits

Author SHA1 Message Date
Kristjan ESPERANTO
d7348ed765 [tests] suppress debug logs in CI environment + improve calendar symbol test stability (#3941)
## CI Log Suppression

**Two-level approach for clean test output:**

1. **Suppress debug/info logs**: Call `logger.setLogLevel("ERROR")` in
CI to hide verbose logging
2. **Suppress intentional error logs**: Set `mmTestMode` flag and check
it before logging errors that are part of test assertions (e.g., testing
error handling in `git_helper.js` and `server_functions.js`)

This keeps CI output clean and makes genuine failures immediately
visible, while preserving full logging for local development.

**Before:** 1348 log lines with verbose debug/info output  
**After:** 168 log clean lines with only test results

## Calendar Symbol Test Stability

Convert the calendar symbol test from external URL (`calendarlabs.com`)
to existing local mock file (`12_events.ics`). This eliminates CI
timeouts caused by external dependencies and improves test reliability.

The test still validates the same symbol array feature but now runs
faster and deterministically without network dependencies.
2025-11-03 23:49:21 +01:00
sam detweiler
5e337f8b5f fix #3267, CORRECTLY, add testcase, add testcase for #3279 (#3681)
fixes #3267 AGAIN, correctly, add testcase
add testcase for #3679 , broadcast clipping incorrectly

I added a test module (tests/testNotification) to catch the notification
and check the count. (one way to configure)
i put this module in the tests folder, and added /tests to the server
paths.
(can't have a module in a nested folder, like tests/modules/xxx)

but I have a problem. i can run the test config (MM_CONFIG_FILE), and
the two modules work correctly,
but in the spec runner, the calendar module times out on the broadcast
test.. there is only local ics file access, no outside hosts

I forced my system date to 1/1/24 (same as runner) and again the manual
testcase works fine

I added two test config.js,(configs/calendar) one works great (symbols)
, one fails (broadcast test)
I added additional delay in the calendarspec runner to try to debug the
module, but it still not long enough.. no messages of trouble when I get
into the browser.. BUT, this may be because of the log being turned
off... (just thought of this)

I created a special ICS (in mocks) that has 12 events, 1 for each
month.. (so I can check clipping and broadcast) the US holidays one is
sensitive to the current date, and I couldn't get it to work on
1/1/2024..

also, in general, is there a mechanism to run test:just_one_runner?
waiting thru the electron test to get to one testcase.. ugh..
2025-01-05 22:25:32 +01:00